Μαρ 17, 2018 | Case Study, CHP | Cogeneration, Cogeneration, UK Case Studies, University, University Case Studies
The energy centre at the University of Liverpool is situated in the heart of a 90 acre site in the city centre of Liverpool. The combined heat and power (CHP) plant provides electricity and heat to the whole campus of around 30,000 students and 5,000 staff. The...
Σεπ 17, 2013 | Case Study, Natural Gas Case Studies, UK Case Studies, University Case Studies
Glasgow Caledonian University commissioned Clarke Energy through main contractor Crown House to deliver a combined heat and power facility (CHP) at their campus in central Glasgow. The facility is a show-case for CHP technology and will give direct commercial benefits...
Αυγ 21, 2013 | University Case Studies
Clarke Energy has been awarded the contract to design and construct a turnkey cogeneration plant at Charles Sturt University (CSU) in Bathurst, New South Wales, Australia. University to achieve 25% reduction in energy consumption through self-generation of electricity...
Νοέ 1, 2011 | CHP / Cogeneration, Clarke Energy, Cogeneration, Jenbacher Type-3 Gas Engines, Natural Gas, Natural Gas Case Studies, Tri-generation (CHPC) / quad -generation, UK Case Studies, University, University Case Studies
Edinburgh University has three CHP facilities that reduce emissions on the campus. Pollock Halls of Residence Cogeneration Plant Edinburgh University’s first combined heat and power (CHP) project was the 2003 installation of a 526kWe GE Jenbacher reciprocating engine...