Nov 5, 2021 | Electricity generation, Gas Engines, Generation, Natural Gas, News, Nigeria, Nigeria News, Western Africa News
The Mamuda Group, one of the largest manufacturing groups in Northern Nigeria is ramping production and diversifying its product lines on the strength of their ability to generate their own power. According to the Manufacturing Association of Nigeria, over 40 percent...
Oct 27, 2021 | Generation, Industrial, News, Nigeria, Nigeria News, Western Africa News
For Aspira Nigeria Ltd, which is part of Lee Group of Companies (second highest employer in Kano after the state government), its most daunting challenge in keeping its machines running used to be frequent power cuts until it turned to gas. Sami Jafaar, MD Aspira...
May 22, 2018 | Bangladesh, Events - Bangladesh, Past Events
Clarke Energy’s Bangladesh operation successfully participated in the 2nd BigTEX Chittagong 2018 – International Garment & Textile Machinery Expo held from 10th – 12th May 2018 at GEC Convention Center, Chittagong. The said exhibition was jointly organized by...
Jul 12, 2016 | Algeria News, Botswana News, Cameroon News, CHP / Cogeneration, Clarke Energy, Diesel Engines, Eastern Africa News, Mozambique News, Natural Gas, Natural Gas News, News, Nigeria, Nigeria News, Northern African News, South Africa News, Southern Africa News, Tanzania News, Tri-generation (CHPC) / quad -generation, Tunisia, Tunisia News, Western Africa News
Power Supplies The lack of reliable, cost effective power is a massive drain on Africa’s economies. The continent’s power supplies are characterised by being excessively powered by high cost liquid fuels such as diesel and the intermittency of mains electricity. The...
Jan 10, 2014 | Australia, Australia Case Studies, Australia News, Case Study, Clarke Energy, Coal bed methane, Gas Engines, Jenbacher Type-6 Gas Engines, Natural Gas Case Studies, News
Clarke Energy has signed a deal with Australia Pacific LNG to provide a 30MW temporary power plant to their coal seam gas processing plant in Queensland. Clarke Energy to provide 30 MW temporary power station to support operation of Reedy Creek coal seam gas...