Jul 18, 2023 | Energy Storage, Microgrids, Renewable Case Studies, USA Case Studies
The City of Middletown’s Department of Public Works, Connecticut chose Clarke Energy to design and engineer a hybrid energy, turnkey microgrid solution to support a large recreation facility. The facility is located on the previous site of the Woodrow Wilson Middle...
Oct 14, 2021 | Case Study, CHP / Cogeneration, CHP | Cogeneration, Cogeneration, Commercial CHP, Hydrogen, Industrial, Jenbacher Type-6 Gas Engines, Natural Gas Case Studies, Renewable Case Studies, UK Case Studies
Sterling Pharma Solutions is a global pharmaceutical contract development and manufacturing organisation (CDMO). As part of its sustainability strategy, Sterling partnered with Clarke Energy to act as principal contractors, to design, construct and maintain a bespoke...
Dec 17, 2020 | Agricultural, Biogas, Biogas Upgrading, Biogas Upgrading Case Studies, Case Study, France Case Studies, Renewable Case Studies
In 2009, 40 farmers from the commune of Vire in Normandie and its surrounding areas came together to create an innovative and unifying project to promote collective anaerobic digestion. It has taken over 10 years to define the project, to find the land, to obtain...
Aug 21, 2020 | Biogas, Case Study, CHP | Cogeneration, Cogeneration, Jenbacher Type-3 Gas Engines, Renewable Case Studies, USA Case Studies
The City of East Lansing’s Water Resource Recovery Facility (formerly named the Wastewater Treatment Plant) provides wastewater treatment for the City of East Lansing, Michigan State University and Meridian Charter Township. A new environmentally friendly digester is...
Aug 17, 2020 | CHP / Cogeneration, CHP | Cogeneration, Jenbacher Type-4 Gas Engines, Renewable Case Studies, Renewable Energy, Sewage Gas, USA Case Studies
The Grand Rapids Environmental Services Department operates the water resource recovery facility to keep all untreated sewage out of the Grand River in Michigan. The plant collects and treats an average of 40 million gallons of wastewater a day, using state-of-the-art...
Aug 6, 2020 | CHP | Cogeneration, India Case Studies, Renewable Case Studies, Sewage Gas, Sewage Gas Case Studies
The single Jenbacher JGS 320 gas engine has completed 100,000 hours of operation, generating 55GWh of renewable power since commissioning in 2006. Kodungaiyur plant has the capacity to treat 110 million litres of sewage per day. Chennai Metropolitan Water Supply and...