Apr 8, 2021 | Jenbacher Case Studies, Jenbacher Type-4 Gas Engines, Northern African News, Tunisia, Tunisia Case Studies
CSM GIAS cogeneration facility will generate 1.2 MWe with an overall energy efficiency of 80% Electricity production has been operational since Q4 2020 The project guarantees savings of 55% on the plant’s energy bill After the previous success of the...
Mar 9, 2021 | Agricultural, Biogas, Case Study, CHP | Cogeneration, France, France Case Studies, Jenbacher Case Studies, Jenbacher Type-4 Gas Engines
In September 2015, 4 farms located in the Southern High Marned came together to operate a collective agricultural methanisation unit in Chalancey. Together, they combined to create the company SAS CMV Biogas. Nicolas LORIMIER and its associates then successfully...
Oct 27, 2020 | CHP / Cogeneration, Generation, Industrial, Jenbacher Case Studies, Jenbacher Type-6 Gas Engines, Natural Gas, USA Case Studies
Unilever Hammond Indiana has been in operation since 1929. Today they are primarily specializing in synthetic bar soaps under the Dove and Caress brands. The facility supplies the North American market with an estimated 950 million bars of soap annually. Grastim...
Oct 22, 2020 | Case Study, CHP / Cogeneration, CHP | Cogeneration, Cogeneration, Industrial, Jenbacher Case Studies, Jenbacher Type-6 Gas Engines, UK Case Studies
FTSE 250 company Cranswick PLC is one of the largest food producers in Britain, who have launched a sustainability strategy to become the world’s most sustainable meat business. The company’s largest site at Preston is in operation 24/7 and is heat and power...
Jan 18, 2017 | Biogas, Biogas Case Studies, Case Study, Jenbacher Case Studies, Romania Case Studies
The largest biogas plant in Romania was developed by Clarke Energy Romania (former TEB Energy Business). Moara Project was designed to function on renewable energy sources to produce biogas from energy crops (field corn refuse). The two Jenbacher Type-4 engines use...
Jan 18, 2017 | Case Study, Jenbacher Case Studies, Natural Gas Case Studies, Romania Case Studies
The 22.8MW full turnkey power plant project at VEST ENERGO was completed in three stages. The generated electricity produced by the engines is injected in National Energy System (SEN), while the heat is delivered to Bucharest’s district-heating system (RADET). Clarke...