Dec 15, 2011 | Coal bed methane, Coal mine methane, News, Remote Generation
This article is adapted and reproduced from GE Energy’s Cogen Magazine, Issue 5, 2011, p 31 In the search for new energy sources and low-cost alternatives to natural gas, a previously little-used gas has moved into the spotlight. With major reserves found all over the...
Oct 23, 2011 | Australia, Australia Case Studies, Coal Gas, Coal Gas Case Studies, Coal mine methane, Jenbacher Type-6 Gas Engines
Clarke Energy was contracted to undertake the ‘turnkey’ design and construction of the Moranbah North Power Station on behalf of EDL. The Power Station consists of 15 GE Jenbacher 3.0MWe gas engines with electrical efficiencies higher than 43%. The engines were...
Oct 21, 2011 | Australia, Australia Case Studies, Coal Gas, Coal Gas Case Studies, Coal mine methane, Jenbacher Type-6 Gas Engines
Glennies Creek is Envirogen’s fourth coal mine gas fired power station, with the first completed nearly 10 years ago. Each of the three existing sites is operated and maintained by Clarke Energy on behalf of Envirogen under a long-term operation &...
Dec 3, 2008 | Archive, China News, Coal Gas, Coal mine methane, Safety
Clarke Energy’s continued success and worldwide growth has been further enhanced with the recent signing of two coal mine methane powered turnkey projects to be constructed in the Sichuan and Shanxi Provinces. These two turnkey projects are the first order for Clarke...