• Contact
  • Despre noi
  • Cariere
  • Țări
    • Africa
      • Algeria
      • Republica Botswana
      • Republica Camerun
      • Consiliul pentru Refugiați Danemarca
      • Republica Ghana
      • Coasta de Fildeș
      • Kenya
      • Maroc
      • Mozambic
      • Nigeria
      • Rwanda
      • Africa de Sud
      • Tanzania
      • Republica Tunisiană
    • Americas
      • SUA
    • Asia
      • Bangladesh
      • India
    • Europa
      • Franța
      • Grecia
      • Irlanda
      • România
      • Marea Britanie
    • Pacificul de Sud
      • Australia
      • Noua Zeelandă
      • Papua-Noua Guinee
  • Română
    • English
    • Français
    • English (US)
    • Ελληνικά

Load More Search Results

Generic filters
Exact matches only

  • Română
    • English (Engleză)
    • Français (Franceză)
    • English (US)
    • Ελληνικά (Greacă)

  • Produse
    • Motoare pe gaz INNIO Jenbacher
      • Motor Jenbacher tip 2
      • Motor Jenbacher tip 3
      • Motor Jenbacher tip 4
      • Motor Jenbacher tip 6
    • Specificații motor
      • Configurații motoare pe gaz
      • Echipament auxiliar
      • Controlul motoarelor pe gaz
      • Motoare pe gaz folosite
    • TPI- instalatii de modernizare a centralelor pe biogaz
    • Grupuri electrogene KOHLER
  • Putere
    • Electricitate
    • Cogenerare / CHP
    • Trigenerare / CCHP
    • Tehnologie de generația a patra / CCHP + CO2
    • Reziliența energiei
    • Soluții hibride
    • Microrețele
    • Soluții de producere la distanță
    • Sisteme de stocare a energiei în baterii (BESS)
  • Aplicații
    • Biogaz
      • Agricultura
      • Biometan / GNR – Gaze Naturale Regenerabile
      • Centrale de echilibrare pe biogaz
      • Distilerii
      • Deșeuri alimentare
      • Gaz de fermentare a deșeurilor
      • Tratare mecano-biologică
      • Ape uzate provenite de la fabricile de ulei de palmier
      • Gaze de canalizare
    • Gaz natural
      • Fabrici de bere
      • Centrale electrice
      • GNC / GNL
      • Clădiri comerciale
      • Fabrici de produse lactate
      • Centre de date
      • Sisteme centralizate de furnizare a energiei
      • Sere
      • Spitale
      • Producători de energie electrica independenți
      • Producție industrială
      • Centrale de varf
      • Clădiri rezidențiale și centre comunitare
      • Energie în regim „stand-by”
    • Reducerea emisiilor
      • Gaze asociate / gaze arse
      • Gaz de mină
      • Gaz de la instalațiile de ardere
    • Alte surse regenerabile
      • Hidrogen
      • Gaze regenerabile
      • Singaz sau gazul de sinteză
      • Captarea, utilizarea și stocarea dioxidului de carbon (CCUS)
  • EPC
    • Inginerie de proiect
    • Managementul de proiect
  • Servicii
    • Punere în funcțiune
    • Contracte de întreținere
    • Instruire tehnică
    • Monitorizare și diagnosticare la distanță
    • Service în teren
    • Piese de schimb
    • Revizii tehnice si reparatii
    • Conversii, modificări și modernizări
  • Noutăți
  • Evenimente
  • Studii de caz
  • Cariere
  • Contact
Clarke Energy Appointed Principal Contractor for Third Grid-Resilience BESS Project with Field

Clarke Energy Appointed Principal Contractor for Third Grid-Resilience BESS Project with Field

iul. 14, 2025 | Energy Storage, News, UK News

The third project in the portfolio, a 50MW/100MWh BESS system at Drum Farm near Keith, Scotland, is scheduled to commence site-works in late summer 2025 and reach completion in 2026. Clarke Energy has been appointed as the principal contractor, responsible for...
Demand Side Response – Have We Forgotten About the Little Guy? Adam Wray-Summerson

Demand Side Response – Have We Forgotten About the Little Guy? Adam Wray-Summerson

iul. 3, 2025 | News, UK News

AUTHOR Adam Wray-Summerson Technical Sales Director     The UK energy transition has largely focused on large-scale renewables and industrial decarbonisation, but this thought piece argues that behind-themeter (BTM) distributed generation and demand side...
In engleza: Beyond Efficiency: Why Ease of Maintenance Matters When Selecting Rotating Equipment

In engleza: Beyond Efficiency: Why Ease of Maintenance Matters When Selecting Rotating Equipment

iun. 19, 2025 | India, India News, News, Service

When it comes to selecting rotating equipment—whether it’s pumps, compressors, turbines, or motors—most engineers and procurement teams instinctively focus on performance, efficiency, and lifespan. While these are undeniably crucial, there’s another...
In engleza: 30,000 Hours Overhaul Completed at CAVEO Automotive in Tunisia

In engleza: 30,000 Hours Overhaul Completed at CAVEO Automotive in Tunisia

iun. 17, 2025 | Service, Tunisia, Tunisia News

Our technical teams at Clarke Energy Tunisia recently carried out a major service operation at our client CAVEO AUTOMOTIVE TUNISIA S.A. , a company specialized in the design, manufacturing, and marketing of conventional and parabolic leaf springs for all types of...
In engleza: Clarke Energy’s Engines Power LGI’s Eastern Creek Renewable Energy Project

In engleza: Clarke Energy’s Engines Power LGI’s Eastern Creek Renewable Energy Project

iun. 13, 2025 | Australia, Australia News, Biogas, Clarke Energy, Gas Engines, Jenbacher Type-3 Gas Engines, Landfill Gas, News

Clarke Energy is proud to have supplied the 4MW generator package to LGI Ltd for their Eastern Creek Renewable Power Project, a landmark collaboration between LGI Ltd and BINGO INDUSTRIES. Situated within BINGO’s Eastern Creek Recycling Ecology Park in New South...
In engleza: Triton Power and Clarke Energy Sign Contract for 49MWe Hydrogen-Ready Gas Peaking Plant at Deeside Power Station

In engleza: Triton Power and Clarke Energy Sign Contract for 49MWe Hydrogen-Ready Gas Peaking Plant at Deeside Power Station

mai 22, 2025 | Clarke Energy, Hydrogen, Jenbacher Type-6 Gas Engines, UK News

Deeside, UK – 22 May 2025 — Triton Power and Clarke Energy are pleased to announce the signing of construction contracts for a new 49MWe gas-fired peaking plant at the Deeside Power Station, owned and operated by Triton Power. The facility, scheduled to begin...
<< Articole mai vechi

Găsiți un articol de știri

Generic filters
Exact matches only

Găsiți după categorie

Latest Posts

Clarke Energy Appointed Principal Contractor for Third Grid-Resilience BESS Project with Field
Seamlessly Powering Prestige at the Old Course Hotel, St Andrews
Demand Side Response – Have We Forgotten About the Little Guy? Adam Wray-Summerson

Load More Search Results

Generic filters
Exact matches only

  • Urmărește
  • Urmărește
  • Urmărește
  • Urmărește
  • Urmărește

  • Română
    • English (Engleză)
    • Français (Franceză)
    • English (US)
    • Ελληνικά (Greacă)

Abonați-vă la newsletter

Companie

  • Despre noi
  • Contact
  • Cariere
  • Istoric
  • Știri
  • Asociații Profesionale

Află mai multe

  • Politica de confidențialitate
  • Etică
  • Sclavia și traficul de ființe umane
  • Politica cookie
  • Termenii serviciului
  • Raportarea salariilor de gen
  • GDPR HR Privacy Notice
  • Sanatate si siguranta
  • Bază de cunoștințe
  • Declarație legală
  • Solicitare de acces la subiect
  • Raport CbCR

Calitate     Integritate     Fiabilitate     Responsabilitate 

2025 © Clarke Energy. All rights reserved.