Nov 12, 2025 | Actualités, Actualités - UK, Gas Naturel, Moteur Jenbacher – Type 6, Production d'électricité
Clarke Energy and INNIO Group have now completed delivery of the full fleet of “Ready for H2” Jenbacher J624 engines at Statera Energy’s project in Thurrock. Thurrock Power, a 450MW flexible generation plant, will support grid stability and flexibility in Southeast...
Mai 22, 2025 | Actualités - UK, Clarke Energy fr, Hydrogène, Moteur Jenbacher – Type 6
Deeside, UK – 22 May 2025 — Triton Power and Clarke Energy are pleased to announce the signing of construction contracts for a new 49MWe gas-fired peaking plant at the Deeside Power Station, owned and operated by Triton Power. The facility, scheduled to begin...
Mai 9, 2024 | Actualités, Clarke Energy fr, Cogénération de serres - CHP, énergies renouvelables, Moteurs à gaz
The recent solar eclipse in the United States highlighted a unique challenge for the country’s power generation network, particularly due to significant reliance on solar energy. The eclipse caused a noticeable reduction in sunlight, impacting solar power generation....
Avr 10, 2024 | Actualités, Biogas fr, Clarke Energy fr, Moteurs à gaz
As our electricity grids transition to net zero carbon, and with a proliferation of intermittent wind and solar energy, electricity networks around the world are being strained. This is coupled with closure of centralised coal, gas and nuclear power stations. Further...
Mar 5, 2024 | Actualités, Moteur Jenbacher – Type 6, Romania, Romania News
With the first phase of the Clarke Energy and Navios peaking plant project in Romania now fully commissioned, we are delighted to announce that the second phase is now well underway in Racari. Phase 2 will supply an additional 20MW and 6 x INNIO Jenbacher Type-6...