• Contact
  • About Us
  • Careers
  • Countries
    • Africa
      • Algeria
      • Botswana
      • Cameroon
      • Democratic Republic Of The Congo
      • Ghana
      • Ivory Coast
      • Kenya
      • Libya
      • Morocco
      • Mozambique
      • Nigeria
      • Rwanda
      • South Africa
      • Tanzania
      • Tunisia
    • Americas
      • USA
    • Asia
      • Bangladesh
      • India
    • Europe
      • France
      • Greece
      • Ireland
      • Romania
      • United Kingdom
    • South Pacific
      • Australia
      • New Zealand
      • Papua New Guinea
  • English (US)
    • English
    • Français
    • Ελληνικά
    • Română

Load More Search Results

Generic filters
Exact matches only

  • English (US)
    • English
    • Français (French)
    • Ελληνικά (Greek)
    • Română (Romanian)

  • Products
    • INNIO Jenbacher Gas Engines
      • Jenbacher Type-2 Engine
      • Jenbacher Type-3 Engine
      • Jenbacher Type-4 Engine
      • Jenbacher Type-6 Engine
    • Engine Provision
      • Engine Configurations
      • Ancillary Equipment
      • Gas Engine Control
      • Used Jenbacher Gas Engines
    • Other Products
      • CoEnergy CHP Units
      • TPI Biogas Upgrading
      • KOHLER Diesel Gensets
  • Power
    • Electricity Generation
    • Cogeneration / CHP
    • Trigeneration / CCHP
    • Quadgeneration / CHP and CO2
    • Demand Side Management
    • Energy Resilience
    • Battery Energy Storage Systems (BESS)
    • Hybrid Power Solutions
    • Microgrids
    • Remote Generation
    • Standby Power
  • Applications
    • Biogas
      • Agricultural Biogas
      • Biomethane / RNG
      • Biogas Peaking Stations
      • Distilleries
      • Food Waste
      • Landfill Gas
      • Mechanical Biological Treatment
      • Palm Oil Mill Effluent
      • Waste Water Treatment and Sewage
    • Pipeline Gas
      • Breweries
      • Captive Power Plants
      • CNG / LNG
      • Commercial Buildings
      • Dairies
      • Data Centers
      • District Energy
      • Glasshouses
      • Hospitals
      • Independent Power Producers
      • Industrial and Manufacturing
      • Peaking Plants
      • Residential and Community
      • Standby Power
    • Emissions Reduction
      • Associated Petroleum Gas / Flare Gas
      • Coal Gas
      • Furnace Gas
    • Other Renewables
      • Hydrogen
      • Renewable Gas
      • Syngas and Synthesis Gas
      • Carbon Capture Utilization and Storage (CCUS)
  • EPC
    • Project Engineering
    • Project Management
  • Service
    • Commissioning
    • Maintenance Agreements
    • Technical Training
    • Remote Monitoring & Diagnostics
    • Field Service
    • Spare Parts
    • Upgrades, Repair and Overhaul
    • Conversions, Modifications and Upgrades
  • News
  • Events
  • Case Studies
  • Careers
  • Contact
WEFTEC Exhibition 2023 | October 2 – 4 | Chicago, IL

WEFTEC Exhibition 2023 | October 2 – 4 | Chicago, IL

Sep 21, 2023 | Clarke Energy Events, Events – USA

Clarke Energy is back to exhibit again at this year’s WEFTEC conference and showcase at the McCormick Place in Chicago, Illinois, October 2-4. Our experience in the biogas / wastewater treatment space has developed significantly across the US, and here we look to...
Grand Rapids Water Resource Recovery Facility, Michigan US

Grand Rapids Water Resource Recovery Facility, Michigan US

Aug 17, 2020 | CHP / Cogeneration, CHP | Cogeneration, Jenbacher Type-4 Gas Engines, Renewable Case Studies, Renewable Energy, Sewage Gas, USA Case Studies

The Grand Rapids Environmental Services Department operates the water resource recovery facility to keep all untreated sewage out of the Grand River in Michigan. The plant collects and treats an average of 40 million gallons of wastewater a day, using state-of-the-art...
55GWh of Renewable Power Generated at Kodungaiyur Sewage Treatment Plant

55GWh of Renewable Power Generated at Kodungaiyur Sewage Treatment Plant

Aug 6, 2020 | CHP | Cogeneration, India Case Studies, Renewable Case Studies, Sewage Gas, Sewage Gas Case Studies

The single Jenbacher JGS 320 gas engine has completed 100,000 hours of operation, generating 55GWh of renewable power since commissioning in 2006. Kodungaiyur plant has the capacity to treat 110 million litres of sewage per day. Chennai Metropolitan Water Supply and...

Find A News Article

Generic filters
Exact matches only

Find by Category

Latest Posts

Clarke Energy Australia Spreads Christmas Cheer at Staff Children’s Picnic
Clarke Energy India Reinforces Its Commitment to Sustainable Bioenergy at REI Expo 2025
Clarke Energy and INNIO Collaborate on Landmark Project with Statera Energy to Support UK Grid Stability

Load More Search Results

Generic filters
Exact matches only

  • Follow
  • Follow
  • Follow
  • Follow
  • Follow

  • English (US)
    • English
    • Français (French)
    • Ελληνικά (Greek)
    • Română (Romanian)

Sign Up To Our Newsletter

Company

  • About Us
  • Contact
  • Careers
  • Clarke Energy History
  • Newsletter
  • Trade Associations

Learn More

  • Privacy Policy
  • Ethics
  • Slavery and Human Trafficking
  • Cookie Policy
  • Terms of Service
  • Gender Pay Reporting
  • GDPR HR Privacy Notice
  • Health and Safety
  • Knowledge Base
  • Legal Statement
  • Subject Access Request

Quality     Integrity     Reliability     Responsibility

2026 © Clarke Energy. All rights reserved.