Apr 13, 2023 | News, UK News
The recent T-4 Capacity Market auction results in the UK have highlighted the demand for flexible gas engine peaking power plants and energy storage systems. Clarke Energy has successfully delivered multiple-hundreds of megawatts to this sector with the back up of...
Mar 22, 2018 | Case Study, Clarke Energy, Peaking Station Case Sudies, UK Case Studies
Clarke Energy delivered a full turnkey, design and build 21MW electricity generating peaking plant, at Ashford Power, Kings North Industrial Estate, Kent. The plant was delivered within a 40-week period, on time and on budget. The fully automated and unmanned site is...
Dec 18, 2015 | Electricity generation, Gas Engines, Jenbacher Type-4 Gas Engines, Natural Gas, News, UK News
About the Capacity Market The Capacity Market is a key component of the reform of the UK electricity market. The UK’s electricity grid has historically relied on large centralised power plants supplying domestic and business consumers alike. The old coal power plants...