Clarke Energy Delivers Côte d’Ivoire’s First Industrial Trigeneration Plant for Dream Cosmetics

Dream Cosmetics, a major cosmetics producer in Côte d’Ivoire, sought to enhance the reliability of its energy supply while reducing operating costs and environmental impact. To meet these objectives, the company partnered with Clarke Energy to design and deliver the country’s first industrial 2MW trigeneration plant.

The Challenge

Dream Cosmetics required an integrated energy solution capable of delivering a reliable and continuous electricity supply while also providing industrial steam for its manufacturing processes and chilled water for cooling applications.

The company was looking to reduce its reliance on the national grid while lowering energy expenditure, enhancing overall energy efficiency, and minimising its environmental impact. By implementing a more efficient and sustainable energy solution, the business aimed to improve operational performance, control energy costs, and support its long-term environmental objectives.


The Clarke Energy Solution

Clarke Energy delivered a turnkey trigeneration system centred around a 2MW gas engine, enabling the simultaneous generation of electricity, steam, and chilled water from a single fuel source to maximise energy utilisation and efficiency.

In addition, the system enhances energy security and operational resilience while reducing dependence on external electricity supplies.

Heat recovered from the engine exhaust gases is used to produce steam at 11-bar for manufacturing processes, ensuring an efficient use of thermal energy.

In addition, the plant generates chilled water at 5°C through an absorption chiller, reducing the electrical demand associated with cooling applications.

By integrating these three energy streams into a single system, the solution delivers improved efficiency, lower operating costs, and greater sustainability for Dream Cosmetics.


The Result

  • Energy Reliability: 2MW of reliable on-site generation reduces dependence on the grid and supports uninterrupted operations.
  • Lower Operating Costs: The simultaneous production of power, heat and cooling improves overall energy economics.
  • Enhanced Energy Efficiency: Recovered waste heat is utilised productively, maximising the value of every unit of fuel consumed.
  • Reduced Environmental Impact: Higher efficiency translates into lower energy losses and reduced emissions.

This landmark project welcomed a visit from His Majesty’s Trade Commissioner for Africa, Alastair Long and a delegation from the UK Department for Business and Trade. This highlighted the value of international collaboration, and the role British engineering expertise can play in supporting industrial development across the African continent.

Key Information
Client: Dream Cosmetics
Location: Côte d’Ivoire
Application: Industrial Trigeneration
Engine Type: Jenbacher JMC612
Electrical Output: 2MW
Steam Production: 11 bar
Cooling Production: Chilled water at 5°C


Why Clarke Energy for projects in Côte d’Ivoire?

With this pioneering project, Dream Cosmetics has become the first industrial company in Côte d’Ivoire to implement an integrated trigeneration solution. By combining on-site power generation, heat recovery and chilled water production within a single system, the company has strengthened operational resilience, improved energy efficiency and reinforced its commitment to more sustainable industrial operations.

This project demonstrates Clarke Energy’s capability as a full project wrap and life-of-asset provider, supporting industrial businesses across Africa in their energy transition through innovative, reliable and high-performance energy solutions.