ian. 18, 2017 | Case Study, Jenbacher studii de caz, Natural Gas Case Studies, Romania Case Studies
Proiectul VEST ENERGO a fost realizat în trei etape Energia electrică generată de motoare este injectată în Sistemul Energetic Național (SEN), în timp ce căldura este livrată sistemului de încălzire centralizată (RADET) din București. Proiectul complet pentru VEST...
ian. 18, 2017 | Case Study, Natural Gas Case Studies, Romania Case Studies
BEPCO este cel mai mare proiect de termoficare din România utilizand motoare cu ardere internă. Societatea a construit, deține și operează patru centrale de cogenerare în orașul Brașov; Energia electrică este injectată în SEN (Sistem Electric Național), în timp ce...
iul. 22, 2016 | Bangladesh, Bangladesh Case Studies, Clarke Energy, Natural Gas, Natural Gas Case Studies, Tri-generation (CHPC) / quad -generation
Badsha Textiles Ltd. one of the largest textiles factory in Bangladesh. Md. Badsha Miah is the Managing Director of Badsha Textiles Ltd., who is one of the CIP (Commercially Important Person) of the Bangladesh Government. Approximately 20,000+ employees work at this...
iul. 18, 2016 | Bangladesh Case Studies, CHP / Cogeneration, Natural Gas, Natural Gas Case Studies
Regent Energy & Power Limited is one of the leading power generating companies in the private sector in Bangladesh and acts as an independent power producer (IPP). With two projects with a capacity of 108 MW and 22 MW, the company assists the people of Bangladesh...
apr. 1, 2015 | Case Study, India Case Studies, Natural Gas, Natural Gas Case Studies, Tri-generation (CHPC) / quad -generation
Kanodia Technoplast operates in flexible packaging. It’s a leading name in India offering integrated packaging solutions to the fast moving consumer goods (FMCG) and industrial segments. The company has been manufacturing laminated films, laminated pouches and...
aug. 4, 2014 | Case Study, Clarke Energy, Cogeneration, Natural Gas Case Studies, UK Case Studies
District energy schemes seemed to be the right decision for the Aberdeen City Council (ACC). They had conducted a study of its housing stock and established that the multi-storey buildings (of which they have 59 in Aberdeen) were too expensive to heat. These buildings...