Juin 25, 2011 | Actualités, Biogas fr, Déchets alimentaires, Études de cas - UK, Études de cas – Biogas, Moteurs à gaz
In 2011 Clarke Energy installed two GE Jenbacher JGMC 420 GS-BL gas engines and exhaust steam boiler for PDM Group. The generators are configured for cogeneration and are integrated with the ReFood anaerobic digestion facility developed by PDM Group and Saria...
Sep 20, 1999 | Actualités, Cogénération de gaz de station d'épuration, Études de cas - UK, Études de cas – Biogas, Gas Naturel, Stations d’épuration
Thames Water has developed a prestigious new sewage treatment plant at Kingston Upon Thames. Jointly designed with Thames Water and constructed by Kvaerner Water, it has been created to serve one third of a million people and as such is the largest built by Thames...