Οκτ 14, 2021 | Case Study, CHP / Cogeneration, CHP | Cogeneration, Cogeneration, Commercial CHP, Hydrogen, Industrial, Jenbacher Type-6 Gas Engines, Natural Gas Case Studies, Renewable Case Studies, UK Case Studies
Sterling Pharma Solutions is a global pharmaceutical contract development and manufacturing organisation (CDMO). As part of its sustainability strategy, Sterling partnered with Clarke Energy to act as principal contractors, to design, construct and maintain a bespoke...
Οκτ 6, 2021 | Greenhouse Case Studies, Greenhouse CHP, Jenbacher Type-4 Gas Engines, Jenbacher Type-6 Gas Engines, Renewable Energy, UK Case Studies
AGR is a leading renewable energy company specialising in low carbon energy generation, with over £350m of projects delivered to date in the UK, including a portfolio of gas peaking and combined heat and power (CHP) projects. AGR developed and is the main EPC...
Ιούν 29, 2021 | Clarke Energy, Cogeneration, Hospital Case Studies, Jenbacher Type-4 Gas Engines, UK Case Studies
Southend University Hospital, which forms part of Mid and South Essex NHS Foundation Trust (MSE), along with Basildon Hospital and Broomfield Hospital, is reaping the financial benefits from an onsite combined heat and power (CHP) scheme . The 1.2MW INNIO Jenbacher...
Οκτ 22, 2020 | Case Study, CHP / Cogeneration, CHP | Cogeneration, Cogeneration, Industrial, Jenbacher Case Study, Jenbacher Type-6 Gas Engines, UK Case Studies
FTSE 250 company Cranswick PLC is one of the largest food producers in Britain, who have launched a sustainability strategy to become the world’s most sustainable meat business. The company’s largest site at Preston is in operation 24/7 and is heat and power...
Μάι 20, 2020 | Case Study, Natural Gas, Peaking Station Case Sudies, UK Case Studies
Bancroft Generation Limited is Clarke Energy’s third project contracted by Forsa Energy to engineer, design and build 130MWe of peaking power generation.in the UK. Bancroft Generation 20MWe peaking plant is designed to provide electricity to the National Grid at...
Απρ 28, 2020 | Case Study, Jenbacher Type-4 Gas Engines, Jenbacher Type-6 Gas Engines, Peaking Station Case Sudies, UK Case Studies
Forsa Energy develop, build and operate energy assets across Europe with a mandate to grow a portfolio of renewable power generation and gas generation projects. Forsa Energy’s UK operations contracted Clarke Energy to act as principal contractors to design and build...