Ιαν 18, 2017 | Case Study, Jenbacher Case Study, Natural Gas Case Studies, Romania Case Studies
The 22.8MW full turnkey power plant project at VEST ENERGO was completed in three stages. The generated electricity produced by the engines is injected in National Energy System (SEN), while the heat is delivered to Bucharest’s district-heating system (RADET). Clarke...
Ιαν 18, 2017 | Case Study, Natural Gas Case Studies, Romania Case Studies
BEPCO was the first large scale district heating project in Romania utilising internal combustion engines. BEPCO built, owns and operate four cogeneration power plants for district heating în Brasov; The electricity is injected in SEN (National Power Grid), while the...
Ιούλ 22, 2016 | Bangladesh, Bangladesh Case Studies, Clarke Energy, Natural Gas, Natural Gas Case Studies, Tri-generation (CHPC) / quad -generation
Badsha Textiles Ltd. one of the largest textiles factory in Bangladesh. Md. Badsha Miah is the Managing Director of Badsha Textiles Ltd., who is one of the CIP (Commercially Important Person) of the Bangladesh Government. Approximately 20,000+ employees work at this...
Ιούλ 18, 2016 | Bangladesh Case Studies, CHP / Cogeneration, Natural Gas, Natural Gas Case Studies
Regent Energy & Power Limited is one of the leading power generating companies in the private sector in Bangladesh and acts as an independent power producer (IPP). With two projects with a capacity of 108 MW and 22 MW, the company assists the people of Bangladesh...
Απρ 1, 2015 | Case Study, India Case Studies, Natural Gas, Natural Gas Case Studies, Tri-generation (CHPC) / quad -generation
Kanodia Technoplast operates in flexible packaging. It’s a leading name in India offering integrated packaging solutions to the fast moving consumer goods (FMCG) and industrial segments. The company has been manufacturing laminated films, laminated pouches and...
Αυγ 4, 2014 | Case Study, Clarke Energy, Cogeneration, Natural Gas Case Studies, UK Case Studies
District energy schemes seemed to be the right decision for the Aberdeen City Council (ACC). They had conducted a study of its housing stock and established that the multi-storey buildings (of which they have 59 in Aberdeen) were too expensive to heat. These buildings...